Please use this identifier to cite or link to this item:
https://repositori.uma.ac.id/handle/123456789/25669
Title: | Perencanaan Ulang Rencana Anggaran Biaya Pekerjaan Trotoar pada Proyek Pembangunan Infrastruktur Permukiman Kawasan Kota Lama Kesawan-Medan |
Other Titles: | Re-planning the Budget Plan for Sidewalk Work on the Settlement Infrastructure Development Project in the Kesawan-Medan Old City Area |
Authors: | Christian, Yoel |
metadata.dc.contributor.advisor: | Ardan, Melloukey |
Keywords: | perencanaan ulang;biaya;harga satuan pekerjaan;manajemen;re-planning;cost;unit price;management project |
Issue Date: | 29-Aug-2024 |
Publisher: | UNIVERSITAS MEDAN AREA |
Series/Report no.: | NPM;208110025 |
Abstract: | Estimasi biaya merupakan salah satu faktor terpenting dalam keberhasilan suatu proyek konstruksi. Estimasi biaya yang akurat mengoptimalkan kontrak yang tepat. Ini melibatkan proses perhitungan yang menganalisis semua biaya untuk pekerjaan tertentu untuk mencapai total biaya tertentu. Untuk hampir semua jenis kontrak, mengembangkan perkiraan biaya yang realistis merupakan bagian penting dari setiap proyek konstruksi. Perkiraan biaya dilakukan sebelum konstruksi dimulai dan bahkan sebelum penawaran dimulai untuk proyek konstruksi. Tujuan dari penelitian ini adalah untuk menganalisis dan menentukan nilai rencana anggaran biaya (RAB) terbaru setelah dilakukan perencanaan ulang pada pelaksanaan pekerjaan trotoar dan menentukan lama waktu yang dibutuhkan setelah dilakukan perencanaan ulang. Metode yang digunakan adalah metode perhitungan ulang biaya dengan menghitung ulang seluruh biaya proyek, mulai dari biaya bahan, biaya tenaga kerja, biaya alat, hingga biaya overhead. Berdasarkan hasil analisa setelah dilakukan identifikasi urutan item pekerjaan (lingkup pekerjaan), mengurai perhitungan volume pekerjaan, menentukan harga tenaga, bahan, alat, overhead yang digunakan di dalam daftar analisa harga satuan pekerjaan (AHSP) sehingga terbentuk harga satuan pekerjaan, mengurai harga tiap item pekerjaan dan menjumlah seluruh harga item pekerjaan lalu menghasilkan rencana anggaran biaya sebesar Rp. 10.271.840.200,00. Cost estimation is one of the most important factors in a company's success construction project. Accurate cost estimates optimize the right contracts. It involves a calculation process that analyzes all costs for the job to achieve a certain total cost. For almost all types of contracts, developing realistic cost estimates is an important part of every construction project. Cost estimates are made before construction begins and even before bidding begins on a construction project. The purpose of This research is to analyze and determine the value of the budget plan Latest costs (RAB) after re-planning implementation sidewalk work and determine how long it will take after it is done re-planning. The method used is the cost recalculation method by recalculating all project costs, starting from material costs, costs labor, tool costs, and overhead costs. Based on the results of the analysis after identification of the sequence of work items (scope of work), decomposition calculating the volume of work, determining the price of labor, materials, tools, overhead used in the work unit price analysis (AHSP) list so that unit price of work is formed, breaking down the price of each item of work and add up all the prices of work items and then produce a cost budget plan amounting to Rp. 10,271,840,200.00. |
Description: | 125 Halaman |
URI: | https://repositori.uma.ac.id/handle/123456789/25669 |
Appears in Collections: | SP - Civil Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
208110025 - Yoel Christian - Fulltext.pdf | Cover, Abstract, Chapter I, II, III, V, Bibliography | 5.25 MB | Adobe PDF | View/Open |
208110025 - Yoel Christian - Chapter IV.pdf Restricted Access | Chapter IV | 319.32 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.